الأحد، 24 فبراير 2019

LA FONTAINE COMPOUND


LA FONTAINE COMPOUND
On a land plot area of about 142,800 m2, the project comprises residential units, entertainment and service facilities, and a shared basement parking below every set of apartment blocks. Infrastructure works include a potable water supply network from the municipality pipeline, feeding the combined water & firefighting local tank (1,600 m3); water distribution network (total pipes' length: 4,000 m; diameters range: 32-200 mm); firefighting loop network (average pipes length: 1,500 m; diameters range: 160-250 mm); gravity collection system (average pipes length: 3,400 m; diameters range: 160-500 mm); irrigation water supply system from the municipality pipeline, feeding the local irrigation tank (550 m3); irrigation loop
Networks (average pipes length: 17,650 m; diameters range: 32-160 mm); and a solid waste collection system.

ليست هناك تعليقات:

إرسال تعليق